기술소개

Unisolve Co., Ltd. gives satisfaction and confidence for customers.
  • 1Warehousing
    inspection‧Storage
    Check material appearance and properties when receiving raw/subsidiary materials.
    Only products that have passed inspection shall be stored in a material storage room and each warehouse .
  • 2Inspection‧Pretreatmen
    Open the material box and move the material to the workplace.
    In the workplace, materials are pre-treated for manufacture.
  • 3Manufacture
    1. Work in accordance with the work standard for each product.
    2. Based on the basic extraction process(check CTQ and CTP by process).

    1. Mixing raw material and solution

    2. Heating during proper time

    3. Sterilization after filtration

    *Processing time and method are different according to raw materials.

  • 4Quality conformance
    Checking the quality and safety of finished products.
    Writing certification documents.
  • 5Final Inspection‧Storage
    Pack the product after the manufacturing process. Seal after product verification.
    Packaged products are store in a warehouse or wait for shipment.